header }

METRON - Case studies

Glass

Process optimisation - Smelting furnace

Consumptions

  • Most energy-intensive device on site
  • Annual energy consumption > 100 GWh

Challenges

  • Detect the most influential flexible parameters on consumption.
  • Recommendations of optimal operational parameters given in real time to operators.

Savings

  • 400,000€ of savings per year (2,5% of energy savings).